BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Cabin Wet Unit Assembly

A one-piece GRP bathroom pod with vacuum toilet, shower and washbasin, plumbed and tested at the cabin factory before the module ships to the yard. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

5 top-level lines · 5 rows shown · 151 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Plumbing Fitting cruise-ship-plumbing-fitting 40× 40 part
2 Vacuum Toilet cruise-ship-vacuum-toilet 1 part
3 Sheet Metal Panel sheet-panel 8 part
4 O-Ring Set oring-set 6 part
5 Fastener Set fastener-set 96× 96 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks