Spindle & Quill Assembly Assembly
The quill slides in the head bore carrying the spinning spindle; a return spring lifts it and the chuck holds the bit. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
7 top-level lines · 11 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Quill Sleeve | drill-press-quill | 1× | 1 | — | part |
| 2 | Spindle | drill-press-spindle | 1× | 1 | — | part |
| 3 | Ball Bearing | ball-bearing | 2× | 2 | — | part |
| 4 | Quill Return Spring 1 parts | drill-press-return-spring | 1× | 1 | — | part |
| 4.1 | Coil Spring | coil-spring | 1× | 1 | — | part |
| 5 | Oil Seal | oil-seal | 1× | 1 | — | part |
| 6 | Spindle Arbor | drill-press-arbor | 1× | 1 | — | part |
| 7 | Jacobs Chuck 3 parts | drill-press-chuck | 1× | 1 | 5 | assembly |
| 7.1 | Chuck Body | drill-press-chuck-body | 1× | 1 | — | part |
| 7.2 | Chuck Jaw | drill-press-chuck-jaws | 3× | 3 | — | part |
| 7.3 | Chuck Key | drill-press-chuck-key | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |