BOMwiki the bill-of-materials encyclopedia

Jacketed Reactor Vessel Assembly

Stainless steel tank with integral water jacket, sight glass, and safety instrumentation. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

7 top-level lines · 7 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Reactor Cylinder emulsion-polymerization-reactor-main-shell 1 part
2 Heat-Transfer Jacket emulsion-polymerization-reactor-jacket 1 part
3 Reactor Top Lid emulsion-polymerization-reactor-lid 1 part
4 Bottom Discharge Valve emulsion-polymerization-reactor-bottom-outlet 1 part
5 RTD Thermowell emulsion-polymerization-reactor-thermometer-pocket 1 part
6 Level Indicator emulsion-polymerization-reactor-sight-glass 1 part
7 O-Ring Set oring-set 3 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks