Onboard Control System Assembly
Monitoring electronics that report doors, brakes, and rope state to the winding house over the line, with attendant controls and emergency stop. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
8 top-level lines · 8 rows shown · 17 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Onboard Controller | funicular-car-onboard-controller | 1× | 1 | — | part |
| 2 | Line Telemetry Unit | funicular-car-line-telemetry | 1× | 1 | — | part |
| 3 | Emergency Stop Button | funicular-car-emergency-stop | 3× | 3 | — | part |
| 4 | Speed Sensor | funicular-car-speed-sensor | 2× | 2 | — | part |
| 5 | Microcontroller | mcu | 2× | 2 | — | part |
| 6 | Bare PCB | pcb-bare | 2× | 2 | — | part |
| 7 | Relay | relay | 4× | 4 | — | part |
| 8 | Speaker | speaker | 2× | 2 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $1–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳JLCPCB jlcpcb.com ↗ | Shenzhen, CN | PCB fabrication | 100 pcs | 2–4 wks |
| 🇨🇳PCBWay pcbway.com ↗ | Shenzhen, CN | PCB fab & assembly | 100 pcs | 2–4 wks |
| scc.com.cn ↗ | Shenzhen, CN | PCB manufacturer | 100 pcs | 2–4 wks |
| shogini.com ↗ | Mumbai, IN | PCB manufacturer | 100 pcs | 2–4 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 100 pcs | 2–4 wks |