Cabinet & Switchgear Assembly
IP20 floor-standing steel enclosure with input, output, and bypass isolation. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
7 top-level lines · 7 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cabinet Frame | industrial-ups-frame | 1× | 1 | — | part |
| 2 | Sheet Metal Panel | sheet-panel | 6× | 6 | — | part |
| 3 | Input Breaker | industrial-ups-input-breaker | 1× | 1 | — | part |
| 4 | Output Breaker | industrial-ups-output-breaker | 1× | 1 | — | part |
| 5 | Power Busbar Set | industrial-ups-busbar-set | 1× | 1 | — | part |
| 6 | Cable Gland Plate | industrial-ups-cable-gland-plate | 1× | 1 | — | part |
| 7 | Fastener Set | fastener-set | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $1–$300 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sonacomstar.com ↗ | Gurugram, IN | EV driveline & motors | 1,000 pcs | 8–12 wks |
| shdrive.cn ↗ | Yuhuan, CN | Gears & driveline | 1,000 pcs | 8–12 wks |
| bharatgears.com ↗ | Mumbai, IN | Automotive gears | 1,000 pcs | 8–12 wks |
| 🇮🇳ZF India zf.com ↗ | Pune, IN | Driveline & chassis | 1,000 pcs | 8–12 wks |
| advancegroup.cn ↗ | Hangzhou, CN | Gearboxes | 1,000 pcs | 8–12 wks |