Jacquard Head Assembly
The selection mechanism mounted above the loom: an array of solenoids selects hooks that the griffe lifts to raise individual warp ends each pick. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 12 rows shown · 11,000 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Lifting Hook | jacquard-loom-hook | 2688× | 2,688 | — | part |
| 2 | Selecting Needle | jacquard-loom-needle | 2688× | 2,688 | — | part |
| 3 | Selection Electromagnet | jacquard-loom-solenoid | 2688× | 2,688 | — | part |
| 4 | Lifting Griffe | jacquard-loom-griffe | 1× | 1 | — | part |
| 5 | Griffe Drive 3 parts | jacquard-loom-griffe-drive | 1× | 1 | 7 | assembly |
| 5.1 | Griffe Cam | jacquard-loom-griffe-cam | 1× | 1 | — | part |
| 5.2 | Griffe Lever | jacquard-loom-griffe-lever | 2× | 2 | — | part |
| 5.3 | Ball Bearing | ball-bearing | 4× | 4 | — | part |
| 6 | Solenoid Driver Board 3 parts | jacquard-loom-module-board | 24× | 24 | 122 | assembly |
| 6.1 | Bare PCB | pcb-bare | 1× | 24 | — | part |
| 6.2 | Microcontroller | mcu | 1× | 24 | — | part |
| 6.3 | SMD Passive (R/C/L) | smd-passives | 120× | 2,880 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |