Dual-Fuel Propulsion Plant Assembly
Twin-skeg plant: two 5-cylinder dual-fuel two-stroke engines burning boil-off gas at 300 bar, each driving a fixed-pitch propeller through a short shaftline. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
9 top-level lines · 13 rows shown · 50,300 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Dual-Fuel Two-Stroke Engine 4 parts | lng-main-engine | 2× | 2 | 22,548 | assembly |
| 1.1 | Cylinder Unit | lng-cylinder-unit | 5× | 10 | — | part |
| 1.2 | Crankshaft | lng-crankshaft | 1× | 2 | — | part |
| 1.3 | Turbocharger | lng-turbocharger | 2× | 4 | — | part |
| 1.4 | Engine Hardware | lng-engine-fastener | 22540× | 45,080 | — | part |
| 2 | Fixed-Pitch Propeller | lng-propeller | 2× | 2 | — | part |
| 3 | Propeller Shaft Section | lng-shaft-section | 6× | 6 | — | part |
| 4 | High-Pressure LNG Pump | lng-hp-pump | 3× | 3 | — | part |
| 5 | Gas Valve Unit | lng-gas-valve-unit | 2× | 2 | — | part |
| 6 | Gas Combustion Unit | lng-gcu | 1× | 1 | — | part |
| 7 | Cryogenic Valve | lng-cryo-valve | 340× | 340 | — | part |
| 8 | Pipe Spool | lng-pipe-spool | 650× | 650 | — | part |
| 9 | Piping Hardware | lng-plant-fastener | 4200× | 4,200 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |