BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Descent Propulsion Module Assembly

Pressure-fed throttleable main engine cluster that removes 1.7 km/s of orbital velocity and can deep-throttle to a tenth of full thrust for the final vertical descent. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

4 top-level lines · 22 rows shown · 466 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Throttleable Main Engine 5 parts lunar-lander-main-engine 3 6 assembly
1.1 Pintle Injector lunar-lander-pintle-injector 3 part
1.2 Combustion Chamber lunar-lander-combustion-chamber 3 part
1.3 Engine Nozzle Extension lunar-lander-engine-nozzle 3 part
1.4 Throttle Valve lunar-lander-throttle-valve 6 part
1.5 O-Ring Set oring-set 3 part
2 Engine Control Unit 5 parts lunar-lander-engine-controller 1 274 assembly
2.1 Bare PCB pcb-bare 2 part
2.2 Microcontroller mcu 2 part
2.3 Power MOSFET mosfet 12× 12 part
2.4 SMD Passive (R/C/L) smd-passives 250× 250 part
2.5 Connector connector 8 part
3 Gimbal Actuator 4 parts lunar-lander-gimbal-actuator 6 28 assembly
3.1 Servo Motor 4 parts servo-motor 6 24 assembly
3.1.1 Stator Assembly 3 parts + deeper › stator-assembly 6 3 assembly
3.1.2 Rotor Assembly 4 parts + deeper › rotor-assembly 6 19 assembly
3.1.3 Encoder encoder 6 part
3.1.4 Motor Housing motor-housing 6 part
3.2 Ball Screw ball-screw 6 part
3.3 Encoder encoder 6 part
3.4 Ball Bearing ball-bearing 12 part
4 Flex Feedline lunar-lander-injector-feedline 6 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $1–$200 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳JLCPCB
jlcpcb.com ↗
Shenzhen, CN PCB fabrication 100 pcs 2–4 wks
🇨🇳PCBWay
pcbway.com ↗
Shenzhen, CN PCB fab & assembly 100 pcs 2–4 wks
scc.com.cn ↗ Shenzhen, CN PCB manufacturer 100 pcs 2–4 wks
shogini.com ↗ Mumbai, IN PCB manufacturer 100 pcs 2–4 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 100 pcs 2–4 wks