Controller and Power Assembly
Main board running tariffs and transactions, a cellular modem for card authorization and back-office sync, and solar-charged battery power for off-grid curbside units. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 11 rows shown · 15 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Control Board 5 parts | parking-pay-station-main-board | 1× | 1 | 10 | assembly |
| 1.1 | Bare PCB | pcb-bare | 1× | 1 | — | part |
| 1.2 | Compute SoC Module | soc-module | 1× | 1 | — | part |
| 1.3 | Microcontroller | mcu | 1× | 1 | — | part |
| 1.4 | SMD Passive (R/C/L) | smd-passives | 1× | 1 | — | part |
| 1.5 | Connector | connector | 6× | 6 | — | part |
| 2 | LTE Modem | parking-pay-station-modem | 1× | 1 | — | part |
| 3 | Solar Panel | parking-pay-station-solar-panel | 1× | 1 | — | part |
| 4 | 12 V Battery | lv-battery | 1× | 1 | — | part |
| 5 | Charge Controller | parking-pay-station-charge-controller | 1× | 1 | — | part |
| 6 | Wire Bundle | wire-bundle | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $1–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳JLCPCB jlcpcb.com ↗ | Shenzhen, CN | PCB fabrication | 100 pcs | 2–4 wks |
| 🇨🇳PCBWay pcbway.com ↗ | Shenzhen, CN | PCB fab & assembly | 100 pcs | 2–4 wks |
| scc.com.cn ↗ | Shenzhen, CN | PCB manufacturer | 100 pcs | 2–4 wks |
| shogini.com ↗ | Mumbai, IN | PCB manufacturer | 100 pcs | 2–4 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 100 pcs | 2–4 wks |