Superstructure Assembly
Multi-deck accommodation deckhouse of welded steel and aluminium with windows and watertight bulkheads. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 6 rows shown · 32 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Deckhouse | passenger-ferry-main-deck-house | 1× | 1 | — | part |
| 2 | Upper Deckhouse | passenger-ferry-upper-deck-house | 1× | 1 | — | part |
| 3 | Watertight Bulkhead | passenger-ferry-watertight-bulkhead | 6× | 6 | — | part |
| 4 | Deck Plating | passenger-ferry-deck-plating | 1× | 1 | — | part |
| 5 | Stairway | passenger-ferry-stairway | 3× | 3 | — | part |
| 6 | Window Frame | passenger-ferry-window-frame | 20× | 20 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
| 🇸🇬Beyonics beyonics.com ↗ | Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |