Fluidics Monitoring Assembly
Irrigation bottles on a motorized pole feed balanced salt solution, with pressure sensors closing the loop on intraocular pressure and vacuum. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
4 top-level lines · 16 rows shown · 30 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Motorized Bottle Pole | phacoemulsification-system-bottle-pole | 1× | 1 | — | part |
| 2 | Pressure Sensor | pressure-sensor | 2× | 2 | — | part |
| 3 | BSS Irrigation Bottle | phacoemulsification-system-bss-bottle | 1× | 1 | — | part |
| 4 | Pole Drive Motor 5 parts | phacoemulsification-system-pole-motor | 1× | 1 | 26 | assembly |
| 4.1 | Stator Assembly 3 parts | stator-assembly | 1× | 1 | 3 | assembly |
| 4.1.1 | Stator Core (laminations) | stator-core | 1× | 1 | — | part |
| 4.1.2 | Copper Winding | copper-winding | 1× | 1 | — | part |
| 4.1.3 | Slot Insulation | stator-insulation | 1× | 1 | — | part |
| 4.2 | Rotor Assembly 4 parts | rotor-assembly | 1× | 1 | 19 | assembly |
| 4.2.1 | Rotor Shaft | rotor-shaft | 1× | 1 | — | part |
| 4.2.2 | Rotor Core | rotor-core | 1× | 1 | — | part |
| 4.2.3 | Neodymium Magnet | neodymium-magnet | 16× | 16 | — | part |
| 4.2.4 | Ball Bearing | ball-bearing | 1× | 1 | — | part |
| 4.3 | Ball Bearing | ball-bearing | 2× | 2 | — | part |
| 4.4 | Motor Housing | motor-housing | 1× | 1 | — | part |
| 4.5 | Helical Gear Pair | gear-pair | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $3–$400 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳BOE boe.com ↗ | Beijing, CN | Display panels | 1,000 pcs | 6–10 wks |
| 🇨🇳Tianma tianma.com ↗ | Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
| 🇨🇳TCL CSOT szcsot.com ↗ | Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |