Avionics Equipment Ring Assembly
Ring shelf at the forward end of the stage carrying the flight computer, inertial navigation, telemetry, tracking, and flight-termination units for the whole launch vehicle. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 11 rows shown · 962 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Flight Computer 5 parts | rocket-upper-stage-flight-computer | 2× | 2 | 467 | assembly |
| 1.1 | Bare PCB | pcb-bare | 3× | 6 | — | part |
| 1.2 | Compute SoC Module | soc-module | 1× | 2 | — | part |
| 1.3 | Microcontroller | mcu | 3× | 6 | — | part |
| 1.4 | SMD Passive (R/C/L) | smd-passives | 450× | 900 | — | part |
| 1.5 | Connector | connector | 10× | 20 | — | part |
| 2 | Inertial Navigation Unit | rocket-upper-stage-ins | 2× | 2 | — | part |
| 3 | Flight Termination System | rocket-upper-stage-fts | 1× | 1 | — | part |
| 4 | GNSS Receiver | rocket-upper-stage-gps-receiver | 2× | 2 | — | part |
| 5 | Wire Bundle | wire-bundle | 3× | 3 | — | part |
| 6 | Connector | connector | 20× | 20 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |