Frame and Final Drive Assembly
A steel-shell main frame using the engine as a stressed member, with shaft final drive, a 25-litre fuel tank, and a centre stand; wet weight runs about 280 kg. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 11 rows shown · 24 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Frame | touring-motorcycle-main-frame | 1× | 1 | — | part |
| 2 | Driveshaft | touring-motorcycle-driveshaft | 1× | 1 | — | part |
| 3 | Final Drive | touring-motorcycle-final-drive | 1× | 1 | — | part |
| 4 | Fuel Tank | touring-motorcycle-fuel-tank | 1× | 1 | — | part |
| 5 | Wheel Assembly 5 parts | wheel-assembly | 2× | 2 | 9 | assembly |
| 5.1 | Alloy Wheel | alloy-wheel | 1× | 2 | — | part |
| 5.2 | Tire | tire | 1× | 2 | — | part |
| 5.3 | TPMS Sensor | tpms-sensor | 1× | 2 | — | part |
| 5.4 | Lug Nut | lug-nut | 5× | 10 | — | part |
| 5.5 | Valve Stem | valve-stem | 1× | 2 | — | part |
| 6 | Fastener Set | fastener-set | 2× | 2 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
| 🇸🇬Beyonics beyonics.com ↗ | Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |