Right Side Panel Assembly
The mirror-image pillar facing the left panel; its receive coils sense the field perturbed by metal passing between the two panels. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 15 rows shown · 171 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Composite Panel Shell | walkthrough-metal-detector-panel-shell | 1× | 1 | — | part |
| 2 | Internal Panel Frame | walkthrough-metal-detector-panel-frame | 1× | 1 | — | part |
| 3 | Transmit Coil 2 parts | walkthrough-metal-detector-transmit-coil | 1× | 1 | 6 | assembly |
| 3.1 | Copper Winding | copper-winding | 3× | 3 | — | part |
| 3.2 | Ferrite Core | walkthrough-metal-detector-ferrite-core | 3× | 3 | — | part |
| 4 | Receive Coil 2 parts | walkthrough-metal-detector-receive-coil | 1× | 1 | 12 | assembly |
| 4.1 | Copper Winding | copper-winding | 6× | 6 | — | part |
| 4.2 | Ferrite Core | walkthrough-metal-detector-ferrite-core | 6× | 6 | — | part |
| 5 | Coil Drive Board 5 parts | walkthrough-metal-detector-coil-board | 1× | 1 | 150 | assembly |
| 5.1 | Bare PCB | pcb-bare | 1× | 1 | — | part |
| 5.2 | Coil Pulse Driver | walkthrough-metal-detector-coil-driver | 1× | 1 | — | part |
| 5.3 | Receive Preamp | walkthrough-metal-detector-preamp | 6× | 6 | — | part |
| 5.4 | Connector | connector | 2× | 2 | — | part |
| 5.5 | SMD Passive (R/C/L) | smd-passives | 140× | 140 | — | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
| 🇸🇬Beyonics beyonics.com ↗ | Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |