Environmental Control System Assembly
Sourcing — likely vendors
Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates| Vendor | HQ | Specialty | Est. unit price | MOQ | Lead time |
|---|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | $13 | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | $14 | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | $21 | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | $16 | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | $14 | 1,000 pcs | 6–10 wks |
Cabin pressurisation, air-conditioning and bleed-air management. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
4 top-level lines · 6 rows shown · 13 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Air Cycle Machine 2 parts | airliner-air-cycle-machine | 2× | 2 | 4 | assembly |
| 1.1 | Ball Bearing | ball-bearing | 2× | 4 | — | part |
| 1.2 | Oil Seal | oil-seal | 2× | 4 | — | part |
| 2 | Heat Exchanger | airliner-heat-exchanger | 2× | 2 | — | part |
| 3 | Outflow Valve | airliner-outflow-valve | 1× | 1 | — | part |
| 4 | Bleed Air Valve | airliner-bleed-valve | 2× | 2 | — | part |