Camera Body Assembly
Magnesium alloy chassis with mechanical shuttering, sensor gate, and damping mounts. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
4 top-level lines · 11 rows shown · 30 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Top Cover | cinema-camera-top-cover | 1× | 1 | — | part |
| 2 | Side Panel | cinema-camera-side-panels | 2× | 2 | — | part |
| 3 | Shutter Mechanism 3 parts | cinema-camera-shutter-assembly | 1× | 1 | 26 | assembly |
| 3.1 | Shutter Drum | cinema-camera-shutter-drum | 1× | 1 | — | part |
| 3.2 | Servo Motor 4 parts | servo-motor | 1× | 1 | 24 | assembly |
| 3.2.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 1 | 3 | assembly |
| 3.2.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 1 | 19 | assembly |
| 3.2.3 | Encoder | encoder | 1× | 1 | — | part |
| 3.2.4 | Motor Housing | motor-housing | 1× | 1 | — | part |
| 3.3 | Encoder | encoder | 1× | 1 | — | part |
| 4 | Fastener Set | fastener-set | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $1–$80 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sunnyoptical.com ↗ | Ningbo, CN | Optics & camera modules | 1,000 pcs | 8–12 wks |
| 🇨🇳OFILM ofilm.com ↗ | Shenzhen, CN | Camera modules | 1,000 pcs | 8–12 wks |
| vvdntech.com ↗ | Gurugram, IN | Electronics & camera modules | 1,000 pcs | 8–12 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 8–12 wks |
| aactechnologies.com ↗ | Singapore | Acoustics & optics | 1,000 pcs | 8–12 wks |