BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Roof Mechanism Assembly

Motorized clamshell roof that opens in about 15 seconds for launch and recovery. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

5 top-level lines · 13 rows shown · 63 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Roof Half drone-docking-station-roof-half 2 part
2 Roof Actuator 4 parts drone-docking-station-roof-actuator 2 27 assembly
2.1 Servo Motor 4 parts servo-motor 2 24 assembly
2.1.1 Stator Assembly 3 parts + deeper › stator-assembly 2 3 assembly
2.1.2 Rotor Assembly 4 parts + deeper › rotor-assembly 2 19 assembly
2.1.3 Encoder encoder 2 part
2.1.4 Motor Housing motor-housing 2 part
2.2 Ball Screw ball-screw 2 part
2.3 Helical Gear Pair gear-pair 2 part
2.4 Encoder encoder 2 part
3 Roof Hinge drone-docking-station-roof-hinge 4 part
4 Roof Seal drone-docking-station-roof-seal 1 part
5 Hall Sensor hall-sensor 2 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks