BOMwiki the bill-of-materials encyclopedia 27,966,200 parts mapped · 127,414 items

Control Box Assembly

Compact controller running motion planning, safety, and the user program. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

5 top-level lines · 18 rows shown · 299 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Controller 5 parts collaborative-robot-control-board 1 211 assembly
1.1 Bare PCB pcb-bare 1 part
1.2 Compute SoC Module soc-module 1 part
1.3 Microcontroller mcu 1 part
1.4 SMD Passive (R/C/L) smd-passives 200× 200 part
1.5 Connector connector 8 part
2 Safety Board 4 parts collaborative-robot-safety-board 1 11 assembly
2.1 Bare PCB pcb-bare 1 part
2.2 Microcontroller mcu 2 part
2.3 Relay relay 4 part
2.4 Connector connector 4 part
3 Power Supply collaborative-robot-power-supply 1 part
4 Configurable I/O Board 4 parts collaborative-robot-io-board 1 75 assembly
4.1 Bare PCB pcb-bare 1 part
4.2 Relay relay 8 part
4.3 Connector connector 6 part
4.4 SMD Passive (R/C/L) smd-passives 60× 60 part
5 Control Enclosure collaborative-robot-control-enclosure 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks