BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Perception Suite Assembly

RTK GNSS, lidar, and multispectral cameras for row following and per-vine assessment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

5 top-level lines · 16 rows shown · 69 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 3D Lidar 4 parts vineyard-robot-lidar 2 27 assembly
1.1 Laser Emitter Module vineyard-robot-laser-module 2 part
1.2 Servo Motor 4 parts servo-motor 2 24 assembly
1.2.1 Stator Assembly 3 parts + deeper › stator-assembly 2 3 assembly
1.2.2 Rotor Assembly 4 parts + deeper › rotor-assembly 2 19 assembly
1.2.3 Encoder encoder 2 part
1.2.4 Motor Housing motor-housing 2 part
1.3 Bare PCB pcb-bare 2 part
1.4 Encoder encoder 2 part
2 RGB Camera 3 parts vineyard-robot-rgb-camera 4 3 assembly
2.1 CMOS Image Sensor image-sensor 4 part
2.2 Lens Assembly camera-lens 4 part
2.3 Bare PCB pcb-bare 4 part
3 Multispectral Camera vineyard-robot-multispectral-camera 1 part
4 RTK GNSS Receiver vineyard-robot-rtk-gnss 1 part
5 IMU Unit vineyard-robot-imu-unit 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks