BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Kettle Vessel Shell

Assembly

Tall insulated boil vessel with a vapor dome. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Kettle Vessel Shell parts and their functions

6 top-level parts · 11 parts in total · full bill of materials below
Kettle Vessel Shell parts diagram: 1 vessel cylinder, 2 dished head, 3 insulation blanket, 4 cladding skin, 5 tank nozzle, 6 manway. 11 parts in 6 top-level items.
Kettle Vessel Shell parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Vessel Cylinder 1× Rolled 304 stainless cylindrical shell course.
2 Dished Head 2× Pressed torispherical end closure welded to the shell.
3 Insulation Blanket 1× Mineral-wool blanket retaining mash temperature.
4 Cladding Skin 1× Outer stainless wrap over the insulation.
5 Tank Nozzle 5× Welded sanitary port for fill, transfer or instrument.
6 Manway 1× Hinged sanitary access door with gasket.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Kettle Vessel Shell

6 top-level lines · 6 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Vessel Cylinder beer-brewhouse-line-vessel-cylinder 1× 1 · part
2 Dished Head beer-brewhouse-line-dished-head 2× 2 · part
3 Insulation Blanket beer-brewhouse-line-insulation-blanket 1× 1 · part
4 Cladding Skin beer-brewhouse-line-cladding-skin 1× 1 · part
5 Tank Nozzle beer-brewhouse-line-tank-nozzle 5× 5 · part
6 Manway beer-brewhouse-line-mash-manway 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks