BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Hot & Cold Liquor Tanks

Assembly

Buffers brewing water at strike, sparge and cooling temperatures. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hot & Cold Liquor Tanks parts and their functions

4 top-level parts · 19 parts in total · full bill of materials below
Hot & Cold Liquor Tanks parts diagram: 1 hot liquor tank, 2 cold liquor tank, 3 liquor level probe, 4 fastener set. 19 parts in 4 top-level items.
Hot & Cold Liquor Tanks parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Hot Liquor Tank 6 parts 1× Insulated tank holding heated strike and sparge water.
2 Cold Liquor Tank 5 parts 1× Insulated tank holding chilled water for wort cooling.
3 Liquor Level Probe 2× Conductive or hydrostatic probe tracking tank fill level.
4 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hot & Cold Liquor Tanks

4 top-level lines · 19 rows shown · 19 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hot Liquor Tank 6 parts beer-brewhouse-line-hot-liquor-tank 1× 1 10 assembly
1.1 Vessel Cylinder beer-brewhouse-line-vessel-cylinder 1× 1 · part
1.2 Dished Head beer-brewhouse-line-dished-head 2× 2 · part
1.3 Steam Heating Jacket 4 parts beer-brewhouse-line-steam-jacket 1× 1 4 assembly
1.3.1 Dimple Jacket Plate beer-brewhouse-line-dimple-plate 1× 1 · part
1.3.2 Steam Trap beer-brewhouse-line-steam-trap 1× 1 · part
1.3.3 Jacket Steam Valve beer-brewhouse-line-jacket-valve 1× 1 · part
1.3.4 Pressure Sensor pressure-sensor 1× 1 · part
1.4 Insulation Blanket beer-brewhouse-line-insulation-blanket 1× 1 · part
1.5 Cladding Skin beer-brewhouse-line-cladding-skin 1× 1 · part
1.6 Temperature Probe (RTD) beer-brewhouse-line-temp-probe 1× 1 · part
2 Cold Liquor Tank 5 parts beer-brewhouse-line-cold-liquor-tank 1× 1 6 assembly
2.1 Vessel Cylinder beer-brewhouse-line-vessel-cylinder 1× 1 · part
2.2 Dished Head beer-brewhouse-line-dished-head 2× 2 · part
2.3 Insulation Blanket beer-brewhouse-line-insulation-blanket 1× 1 · part
2.4 Cladding Skin beer-brewhouse-line-cladding-skin 1× 1 · part
2.5 Temperature Probe (RTD) beer-brewhouse-line-temp-probe 1× 1 · part
3 Liquor Level Probe beer-brewhouse-line-liquor-level-probe 2× 2 · part
4 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks