BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Wort Cooler

Assembly

Plate heat exchanger that chills clarified wort to pitching temperature against cold liquor. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Wort Cooler parts and their functions

5 top-level parts · 13 parts in total · full bill of materials below
Wort Cooler parts diagram: 1 plate heat exchanger, 2 oxygenation stone, 3 cooler temp control valve, 4 temperature probe (RTD), 5 fastener set. 13 parts in 5 top-level items.
Wort Cooler parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Plate Heat Exchanger 4 parts 1× Gasketed plate pack transferring heat from hot wort to coolant.
2 Oxygenation Stone 1× Aerates chilled wort
3 Cooler Temp Control Valve 1× Modulating valve trimming coolant flow to hit pitch temperature.
4 Temperature Probe (RTD) 2× Pt100 sensor in a sanitary thermowell tracking mash temperature.
5 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Wort Cooler

5 top-level lines · 9 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Plate Heat Exchanger 4 parts beer-brewhouse-line-plate-heat-exchanger 1× 1 8 assembly
1.1 Plate Pack beer-brewhouse-line-plate-pack 1× 1 · part
1.2 Frame Plate beer-brewhouse-line-frame-plate 2× 2 · part
1.3 Tie Bar beer-brewhouse-line-tie-bar 4× 4 · part
1.4 O-Ring Set oring-set 1× 1 · part
2 Oxygenation Stone beer-brewhouse-line-oxygenation-stone 1× 1 · part
3 Cooler Temp Control Valve beer-brewhouse-line-cooler-temp-control 1× 1 · part
4 Temperature Probe (RTD) beer-brewhouse-line-temp-probe 2× 2 · part
5 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks