Work Platform
AssemblySelf-leveling basket with guardrails, a rotator, and the platform control console. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Work Platform parts and their functions
4 top-level parts · 12 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Platform Basket | 1× | Steel basket + rails |
| 2 | Leveling Cylinder 3 parts | 1× | Self-leveling cylinder |
| 3 | Platform Rotator | 1× | Platform rotator |
| 4 | Platform Console 3 parts | 1× | Operator controls |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Work Platform
4 top-level lines · 10 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Platform Basket | boom-lift-basket | 1× | 1 | · | part |
| 2 | Leveling Cylinder 3 parts | boom-lift-leveling-cylinder | 1× | 1 | 3 | assembly |
| 2.1 | Cylinder Barrel | boom-lift-cyl-barrel | 1× | 1 | · | part |
| 2.2 | Cylinder Rod | boom-lift-cyl-rod | 1× | 1 | · | part |
| 2.3 | O-Ring Set | oring-set | 1× | 1 | · | part |
| 3 | Platform Rotator | boom-lift-rotator | 1× | 1 | · | part |
| 4 | Platform Console 3 parts | boom-lift-platform-console | 1× | 1 | 7 | assembly |
| 4.1 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 4.2 | Control Joystick | boom-lift-joystick | 2× | 2 | · | part |
| 4.3 | Connector | connector | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |