Control & Monitoring
AssemblyPLC managing machine sequence and temperatures. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Control & Monitoring parts and their functions
4 top-level parts · 19 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Programmable Logic Controller 4 parts | 1× | Industrial PLC controlling all zones. |
| 2 | Touch HMI Panel 2 parts | 1× | 7 inch color touchscreen. |
| 3 | Pump Pressure Sensor | 1× | 0–10 bar pressure transducer, 4–20 mA output. |
| 4 | Tank Level Sensor | 1× | Ultrasonic or float-type level switch. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Control & Monitoring
4 top-level lines · 10 rows shown · 19 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Programmable Logic Controller 4 parts | bottle-washer-plc | 1× | 1 | 15 | assembly |
| 1.1 | Microcontroller | mcu | 1× | 1 | · | part |
| 1.2 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 1.3 | Relay | relay | 5× | 5 | · | part |
| 1.4 | Connector | connector | 8× | 8 | · | part |
| 2 | Touch HMI Panel 2 parts | bottle-washer-hmi | 1× | 1 | 2 | assembly |
| 2.1 | LCD Panel | lcd-panel | 1× | 1 | · | part |
| 2.2 | Touch Digitizer | touch-digitizer | 1× | 1 | · | part |
| 3 | Pump Pressure Sensor | bottle-washer-pressure-sensor | 1× | 1 | · | part |
| 4 | Tank Level Sensor | bottle-washer-level-sensor | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $3–$400. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳BOE
boe.com ↗
|
Beijing, CN | Display panels | 1,000 pcs | 6–10 wks |
|
🇨🇳Tianma
tianma.com ↗
|
Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
|
🇨🇳TCL CSOT
szcsot.com ↗
|
Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |