Tank Chamber
AssemblyStainless steel box open to conveyor on two sides. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Tank Chamber
2 top-level lines as of r17232| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tank Walls | bottle-washer-tank-walls | 1× | 1 | · | part |
| 2 | Tank Bottom | bottle-washer-tank-bottom | 1× | 1 | · | part |