Lid Feed System
AssemblySeparates one end from the stack and marries it to each can before the head. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Lid Feed System parts and their functions
6 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Lid Magazine | 1× | End magazine |
| 2 | Separator Scroll | 2× | Scroll end separator |
| 3 | Lid Transfer Turret | 1× | Lid placement turret |
| 4 | Lid Guide Rail | 1× | Rail holding the end centered on the can into the seaming station. |
| 5 | Lid Presence Sensor | 1× | No-lid no-can interlock |
| 6 | Helical Gear Pair | 1× | Two meshing helical gears forming one reduction stage that steps torque up and speed down between parallel shafts with quiet, continuous tooth contact. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Lid Feed System
6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Lid Magazine | can-seamer-lid-stack | 1× | 1 | · | part |
| 2 | Separator Scroll | can-seamer-separator-knife | 2× | 2 | · | part |
| 3 | Lid Transfer Turret | can-seamer-transfer-turret | 1× | 1 | · | part |
| 4 | Lid Guide Rail | can-seamer-lid-guide | 1× | 1 | · | part |
| 5 | Lid Presence Sensor | can-seamer-lid-sensor | 1× | 1 | · | part |
| 6 | Helical Gear Pair | gear-pair | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |