BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Lid Feed System

Assembly

Separates one end from the stack and marries it to each can before the head. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Lid Feed System parts and their functions

6 top-level parts · 7 parts in total · full bill of materials below
Lid Feed System parts diagram: 1 lid magazine, 2 separator scroll, 3 lid transfer turret, 4 lid guide rail, 5 lid presence sensor, 6 helical gear pair. 7 parts in 6 top-level items.
Lid Feed System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Lid Magazine 1× End magazine
2 Separator Scroll 2× Scroll end separator
3 Lid Transfer Turret 1× Lid placement turret
4 Lid Guide Rail 1× Rail holding the end centered on the can into the seaming station.
5 Lid Presence Sensor 1× No-lid no-can interlock
6 Helical Gear Pair 1× Two meshing helical gears forming one reduction stage that steps torque up and speed down between parallel shafts with quiet, continuous tooth contact.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Lid Feed System

6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Lid Magazine can-seamer-lid-stack 1× 1 · part
2 Separator Scroll can-seamer-separator-knife 2× 2 · part
3 Lid Transfer Turret can-seamer-transfer-turret 1× 1 · part
4 Lid Guide Rail can-seamer-lid-guide 1× 1 · part
5 Lid Presence Sensor can-seamer-lid-sensor 1× 1 · part
6 Helical Gear Pair gear-pair 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks