BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Machine Frame

Assembly

Rigid steel frame and guarding that carry the cutting cylinders against the high cut load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Machine Frame parts and their functions

5 top-level parts · 14 parts in total · full bill of materials below
Machine Frame parts diagram: 1 side frame, 2 sheet metal panel, 3 safety guard, 4 leveling foot, 5 fastener set. 14 parts in 5 top-level items.
Machine Frame parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Side Frame 2× Side frames
2 Sheet Metal Panel 6× Guard panels
3 Safety Guard 1× Interlocked guarding
4 Leveling Foot 4× Leveling feet
5 Fastener Set 1× Frame fasteners

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Machine Frame

5 top-level lines · 5 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Side Frame die-cutting-press-side-frame 2× 2 · part
2 Sheet Metal Panel sheet-panel 6× 6 · part
3 Safety Guard die-cutting-press-safety-guard 1× 1 · part
4 Leveling Foot die-cutting-press-leveling-foot 4× 4 · part
5 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks