Assist Gas System
AssemblyHigh-pressure oxygen and nitrogen supply, regulation, and switching that blows molten metal out of the kerf. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Assist Gas System parts and their functions
6 top-level parts · 10 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Gas Inlet | 2× | O2 and N2 inlets |
| 2 | Gas Regulator | 2× | Gas regulators |
| 3 | Proportional Valve | 1× | Proportional valve |
| 4 | Gas Manifold | 1× | Gas manifold |
| 5 | Pressure Sensor | 2× | Gas pressure sensors |
| 6 | High-Pressure Hose | 2× | High-pressure hoses |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Assist Gas System
6 top-level lines · 6 rows shown · 10 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Gas Inlet | fiber-laser-cutting-machine-gas-inlet | 2× | 2 | · | part |
| 2 | Gas Regulator | fiber-laser-cutting-machine-gas-regulator | 2× | 2 | · | part |
| 3 | Proportional Valve | fiber-laser-cutting-machine-proportional-valve | 1× | 1 | · | part |
| 4 | Gas Manifold | fiber-laser-cutting-machine-gas-manifold | 1× | 1 | · | part |
| 5 | Pressure Sensor | pressure-sensor | 2× | 2 | · | part |
| 6 | High-Pressure Hose | fiber-laser-cutting-machine-gas-hose | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |