Damage Control System
AssemblyFirefighting, dewatering and CBRN systems sustaining the ship after battle or accident damage. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Damage Control System
6 top-level lines as of r78482| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Fire Main | guided-missile-frigate-fire-main | 1× | 1 | · | part |
| 2 | Fire Pump | guided-missile-frigate-fire-pump | 4× | 4 | · | part |
| 3 | Foam System | guided-missile-frigate-foam-system | 1× | 1 | · | part |
| 4 | CBRN System | guided-missile-frigate-cbrn-system | 1× | 1 | · | part |
| 5 | Damage Control Locker | guided-missile-frigate-dc-locker | 6× | 6 | · | part |
| 6 | Pressure Sensor | pressure-sensor | 8× | 8 | · | part |