BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r83760 of this page, not the current version. Go to current · history

Coolant and Chip System

Assembly

Flood and through-spindle coolant delivery with a hinged-belt conveyor that clears chips from the bed. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Coolant and Chip System

5 top-level lines as of r83760
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Coolant Pump coolant-pump 2× 2 · part
2 Coolant Tank horizontal-boring-mill-coolant-tank 1× 1 · part
3 Chip Conveyor horizontal-boring-mill-chip-conveyor 1× 1 · part
4 Coolant Nozzles horizontal-boring-mill-coolant-nozzles 1× 1 · part
5 Pressure Sensor pressure-sensor 1× 1 · part