BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Hydraulic Connections

Assembly

Pressure and return plumbing tying the breaker to the carrier hammer circuit, typically 120–180 bar at 30–450 L/min. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hydraulic Connections parts and their functions

5 top-level parts · 7 parts in total · full bill of materials below
Hydraulic Connections parts diagram: 1 pressure hose, 2 return hose, 3 shut-off valve, 4 port adapter, 5 pressure sensor. 7 parts in 5 top-level items.
Hydraulic Connections parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Pressure Hose 1× High-pressure supply hose
2 Return Hose 1× Low-restriction return hose
3 Shut-Off Valve 2× Ball-type isolation valves
4 Port Adapter 2× ORFS/BSP port adapters
5 Pressure Sensor 1× Operating pressure tap

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hydraulic Connections

5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Pressure Hose hydraulic-breaker-pressure-hose 1× 1 · part
2 Return Hose hydraulic-breaker-return-hose 1× 1 · part
3 Shut-Off Valve hydraulic-breaker-shutoff-valve 2× 2 · part
4 Port Adapter hydraulic-breaker-port-adapter 2× 2 · part
5 Pressure Sensor pressure-sensor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps 200 units 6–10 wks