Tooling Kit
AssemblyInterchangeable punches, dies, blades and optional attachments. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Tooling Kit parts and their functions
5 top-level parts · 15 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Punch | 6× | Assorted sizes |
| 2 | Punch Die | 6× | Hardened die button matched to the punch with running clearance. |
| 3 | Press Brake Attachment | 1× | Optional press brake |
| 4 | Pipe Notch Tool | 1× | Optional pipe notcher |
| 5 | Tool Storage Case | 1× | Steel case holding the punch, die and blade sets. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Tooling Kit
5 top-level lines · 5 rows shown · 15 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Punch | ironworker-machine-punch | 6× | 6 | · | part |
| 2 | Punch Die | ironworker-machine-die | 6× | 6 | · | part |
| 3 | Press Brake Attachment | ironworker-machine-brake-attachment | 1× | 1 | · | part |
| 4 | Pipe Notch Tool | ironworker-machine-pipe-notch-tool | 1× | 1 | · | part |
| 5 | Tool Storage Case | ironworker-machine-tool-case | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |