Fluid End Module
AssemblyOne single-acting fluid cylinder: liner, piston, suction and discharge valves, packing and covers. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Fluid End Module parts and their functions
8 top-level parts · 16 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Fluid Cylinder Block | 1× | Forged fluid-end block |
| 2 | Cylinder Liner | 1× | Renewable cylinder liner |
| 3 | Pump Piston | 1× | Pump piston |
| 4 | Piston Rod | 1× | Reciprocating piston rod |
| 5 | Mud Valve Assembly 3 parts | 2× | Suction and discharge valves |
| 6 | Valve Cover | 2× | Suction and discharge access covers |
| 7 | Stuffing Box 2 parts | 1× | Rod packing assembly |
| 8 | O-Ring Set | 2× | Liner and cover seals |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Fluid End Module
8 top-level lines · 13 rows shown · 16 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Fluid Cylinder Block | mud-pump-fluid-cylinder | 1× | 1 | · | part |
| 2 | Cylinder Liner | mud-pump-liner | 1× | 1 | · | part |
| 3 | Pump Piston | mud-pump-piston | 1× | 1 | · | part |
| 4 | Piston Rod | mud-pump-piston-rod | 1× | 1 | · | part |
| 5 | Mud Valve Assembly 3 parts | mud-pump-valve-assembly | 2× | 2 | 3 | assembly |
| 5.1 | Valve Body | mud-pump-valve-body | 1× | 2 | · | part |
| 5.2 | Valve Seat | mud-pump-valve-seat | 1× | 2 | · | part |
| 5.3 | Valve Spring | mud-pump-valve-spring | 1× | 2 | · | part |
| 6 | Valve Cover | mud-pump-valve-cover | 2× | 2 | · | part |
| 7 | Stuffing Box 2 parts | mud-pump-stuffing-box | 1× | 1 | 2 | assembly |
| 7.1 | Rod Packing | mud-pump-packing | 1× | 1 | · | part |
| 7.2 | O-Ring Set | oring-set | 1× | 1 | · | part |
| 8 | O-Ring Set | oring-set | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |