BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r137859 of this page, not the current version. Go to current · history

Preparation Stage

Assembly

Wet or dry processing, fermentation, drying, hulling, grading, and bagging. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Preparation Stage

1 top-level line as of r137859
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Green Coffee Beans Preparation raw-coffee-beans-preparation 1× 1 · part