BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

You are viewing r137755 of this page, not the current version. Go to current · history

Preparation Stage

Assembly

Separation, dehydration, desalting, stabilization, and blending at terminals. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Preparation Stage

1 top-level line as of r137755
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Crude Oil Preparation raw-crude-oil-preparation 1× 1 · part