BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

You are viewing r137835 of this page, not the current version. Go to current · history

Preparation Stage

Assembly

Washing, chopping, crushing, juice clarification, and bagasse separation. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Preparation Stage

1 top-level line as of r137835
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Sugar Cane Preparation raw-sugar-cane-preparation 1× 1 · part