Preparation Stage
AssemblyGrinding, differential flotation, dewatering, and impurity control. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Preparation Stage
1 top-level line as of r137643| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Zinc Concentrate Preparation | raw-zinc-concentrate-feed-preparation | 1× | 1 | · | part |