BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Ore Stage

Assembly

Indium rides into the supply chain inside zinc sulfide ore at 10–100 ppm; roughly 20 tonnes of concentrate pass through a smelter for each kilogram of indium recovered. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Ore Stage parts and their functions

2 top-level parts · 2 parts in total · full bill of materials below
Ore Stage parts diagram: 1 sphalerite zinc ore, 2 zinc flotation concentrate. 2 parts in 2 assemblies.
Ore Stage parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Sphalerite Zinc Ore ≈40 t run-of-mine ore per kg In
2 Zinc Flotation Concentrate ≈20 t flotation concentrate at ~50 ppm In

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Ore Stage

2 top-level lines · 2 rows shown · 2 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Sphalerite Zinc Ore sphalerite-zinc-ore 1 · part
2 Zinc Flotation Concentrate zinc-concentrate 1 · part

Where the ore stage is used

3 products across 2 domains contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks