Wire Guide System
AssemblyUpper and lower guide heads that locate the wire and flush the cut. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Wire Guide System parts and their functions
4 top-level parts · 10 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Upper Wire Guide Head 3 parts | 1× | |
| 2 | Lower Wire Guide Head 3 parts | 1× | |
| 3 | Flushing Nozzle | 2× | Coaxial nozzle injecting dielectric into the kerf. |
| 4 | Power Feed Contact | 2× | Carbide contact delivering pulse current to the wire. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Wire Guide System
4 top-level lines · 10 rows shown · 10 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Upper Wire Guide Head 3 parts | wire-edm-upper-guide | 1× | 1 | 3 | assembly |
| 1.1 | Diamond Guide Die | wire-edm-diamond-die | 1× | 1 | · | part |
| 1.2 | Guide Block | wire-edm-guide-block | 1× | 1 | · | part |
| 1.3 | O-Ring Set | oring-set | 1× | 1 | · | part |
| 2 | Lower Wire Guide Head 3 parts | wire-edm-lower-guide | 1× | 1 | 3 | assembly |
| 2.1 | Diamond Guide Die | wire-edm-diamond-die | 1× | 1 | · | part |
| 2.2 | Guide Block | wire-edm-guide-block | 1× | 1 | · | part |
| 2.3 | O-Ring Set | oring-set | 1× | 1 | · | part |
| 3 | Flushing Nozzle | wire-edm-flush-nozzle | 2× | 2 | · | part |
| 4 | Power Feed Contact | wire-edm-power-feed-contact | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$30. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| motherson.com ↗ | Noida, IN | Wiring harness & modules | 1,000 sets | 4–6 wks |
|
🇮🇳Polycab
polycab.com ↗
|
Mumbai, IN | Wires & cables | 1,000 sets | 4–6 wks |
|
🇨🇳Luxshare
luxshare-ict.com ↗
|
Dongguan, CN | Connectors & cables | 1,000 sets | 4–6 wks |
|
🇨🇳Hengtong
hengtonggroup.com ↗
|
Suzhou, CN | Cables | 1,000 sets | 4–6 wks |
|
🇮🇳Finolex
finolex.com ↗
|
Pune, IN | Wires & cables | 1,000 sets | 4–6 wks |