BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r190888 of this page, not the current version. Go to current · history

Work Tank

Assembly

Sealed tank that submerges the cut for stable flushing and degassing. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Work Tank

5 top-level lines as of r190888
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Tank Shell wire-edm-tank-shell 1× 1 · part
2 Front Drop Door wire-edm-tank-door 1× 1 · part
3 O-Ring Set oring-set 2× 2 · part
4 Tank Drain Valve wire-edm-drain-valve 1× 1 · part
5 Stainless Work Table Grid wire-edm-work-table-grid 1× 1 · part