BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Crawler Track Leg

Assembly

Steerable crawler on a hydraulic lifting and steering column; four legs support the machine and set elevation, crossfall, and line. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Crawler Track Leg parts and their functions

6 top-level parts · 130 parts in total · full bill of materials below
Crawler Track Leg parts diagram: 1 track chain, 2 track roller frame, 3 drive sprocket, 4 track drive unit, 5 hydraulic lift column, 6 steering cylinder. 130 parts in 6 top-level items.
Crawler Track Leg parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Track Chain 3 parts 1× Steel track chain
2 Track Roller Frame 3 parts 1× Track roller frame
3 Drive Sprocket 1× Toothed wheel transmitting final-drive torque into the track chain.
4 Track Drive Unit 5 parts 1× Drive motor + final drive
5 Hydraulic Lift Column 5 parts 1× Vertical lift leg
6 Steering Cylinder 4 parts 1× Swing / steering cylinder

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Crawler Track Leg

6 top-level lines · 26 rows shown · 130 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Track Chain 3 parts concrete-slipform-paver-track-chain 1× 1 77 assembly
1.1 Track Shoe concrete-slipform-paver-track-shoe 38× 38 · part
1.2 Track Pin concrete-slipform-paver-track-pin 38× 38 · part
1.3 Track Idler concrete-slipform-paver-track-idler 1× 1 · part
2 Track Roller Frame 3 parts concrete-slipform-paver-track-frame 1× 1 30 assembly
2.1 Track Roller concrete-slipform-paver-track-roller 6× 6 · part
2.2 Ball Bearing ball-bearing 12× 12 · part
2.3 Oil Seal oil-seal 12× 12 · part
3 Drive Sprocket concrete-slipform-paver-drive-sprocket 1× 1 · part
4 Track Drive Unit 5 parts concrete-slipform-paver-track-motor 1× 1 10 assembly
4.1 Hydraulic Drive Motor concrete-slipform-paver-hydraulic-motor 1× 1 · part
4.2 Helical Gear Pair gear-pair 2× 2 · part
4.3 Gearbox Housing gearbox-housing 1× 1 · part
4.4 Ball Bearing ball-bearing 4× 4 · part
4.5 Oil Seal oil-seal 2× 2 · part
5 Hydraulic Lift Column 5 parts concrete-slipform-paver-lift-column 1× 1 7 assembly
5.1 Cylinder Barrel concrete-slipform-paver-cylinder-barrel 1× 1 · part
5.2 Cylinder Rod concrete-slipform-paver-cylinder-rod 1× 1 · part
5.3 Column Slide Guide concrete-slipform-paver-slide-guide 2× 2 · part
5.4 Oil Seal oil-seal 2× 2 · part
5.5 O-Ring Set oring-set 1× 1 · part
6 Steering Cylinder 4 parts concrete-slipform-paver-steer-cylinder 1× 1 5 assembly
6.1 Cylinder Barrel concrete-slipform-paver-cylinder-barrel 1× 1 · part
6.2 Cylinder Rod concrete-slipform-paver-cylinder-rod 1× 1 · part
6.3 Oil Seal oil-seal 2× 2 · part
6.4 O-Ring Set oring-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks