BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Picking Table

Assembly

Slowed inspection belt where workers remove clods, stones and rotten tubers by hand. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Picking Table parts and their functions

3 top-level parts · 13 parts in total · full bill of materials below
Picking Table parts diagram: 1 inspection belt, 2 belt roller, 3 ball bearing. 13 parts in 3 top-level items.
Picking Table parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Inspection Belt 1× Wide cleated belt presenting tubers for hand sorting.
2 Belt Roller 4× Driven and idler rollers tensioning the inspection belt.
3 Ball Bearing 8× Deep-groove radial ball bearing.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Picking Table

3 top-level lines · 3 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Inspection Belt potato-harvester-picking-belt 1× 1 · part
2 Belt Roller potato-harvester-picking-roller 4× 4 · part
3 Ball Bearing ball-bearing 8× 8 · part

Something wrong in this list? Report a problem with this BOM.

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks