Ore Stage
AssemblyIndium rides into the supply chain inside zinc sulfide ore at 10–100 ppm; roughly 20 tonnes of concentrate pass through a smelter for each kilogram of indium recovered. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Ore Stage
2 top-level lines as of r139939| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Sphalerite Zinc Ore | sphalerite-zinc-ore | 1× | 1 | · | part |
| 2 | Zinc Flotation Concentrate | zinc-concentrate | 1× | 1 | · | part |