Clear Display Glass Door
AssemblyTempered glass without heating (unlike frozen units), 35–40°F interior prevents frost while showing fresh appeal. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Clear Display Glass Door parts and their functions
4 top-level parts · 4 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tempered Glass Door Pane | 1× | Tempered glass 0.25 inch thick, 30×44 inch, anti-reflection coating for clarity |
| 2 | Glass Frame | 1× | Aluminum frame holds glass, integrated into hinged door assembly |
| 3 | Glass Gasket | 1× | Foam gasket seals glass perimeter against air infiltration |
| 4 | Door Handle | 1× | Recessed stainless steel handle for customer access when dispensing |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Clear Display Glass Door
4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tempered Glass Door Pane | fresh-food-vending-machine-glass-pane | 1× | 1 | · | part |
| 2 | Glass Frame | fresh-food-vending-machine-glass-frame | 1× | 1 | · | part |
| 3 | Glass Gasket | fresh-food-vending-machine-glass-gasket | 1× | 1 | · | part |
| 4 | Door Handle | fresh-food-vending-machine-door-handle | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the clear display glass door is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $3–$400. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳BOE
boe.com ↗
|
Beijing, CN | Display panels | 1,000 pcs | 6–10 wks |
|
🇨🇳Tianma
tianma.com ↗
|
Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
|
🇨🇳TCL CSOT
szcsot.com ↗
|
Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |