BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Frame and Anchoring

Assembly

Plinth, inter-bank tie frame, anchoring, and LED lighting that turn the locker columns into one rigid, levelled station. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Frame and Anchoring parts and their functions

5 top-level parts · 9 parts in total · full bill of materials below
Frame and Anchoring parts diagram: 1 plinth base, 2 tie frame, 3 anchor set, 4 LED strip, 5 fastener set. 9 parts in 5 top-level items.
Frame and Anchoring parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Plinth Base 1× Levelling plinth base
2 Tie Frame 1× Bank tie frame
3 Anchor Set 1× Floor/wall anchors
4 LED Strip 4× Bay lighting strips
5 Fastener Set 2× Structural fasteners

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Frame and Anchoring

5 top-level lines · 5 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Plinth Base luggage-locker-station-plinth 1× 1 · part
2 Tie Frame luggage-locker-station-tie-frame 1× 1 · part
3 Anchor Set luggage-locker-station-anchor-set 1× 1 · part
4 LED Strip luggage-locker-station-led-strip 4× 4 · part
5 Fastener Set fastener-set 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the frame and anchoring is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks