Controls
AssemblyRear-mounted knobs and switches for setting time and alarm, plus a snooze/light button on top. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Controls parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Time-Set Knob | 1× | Hand setting |
| 2 | Alarm-Set Knob | 1× | Cam setting |
| 3 | Alarm Switch | 1× | On/off slider |
| 4 | Snooze Button | 1× | Snooze and light |
| 5 | Backlight LED | 1× | Dial lamp |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Controls
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Time-Set Knob | alarm-clock-time-set-knob | 1× | 1 | · | part |
| 2 | Alarm-Set Knob | alarm-clock-alarm-set-knob | 1× | 1 | · | part |
| 3 | Alarm Switch | alarm-clock-alarm-switch | 1× | 1 | · | part |
| 4 | Snooze Button | alarm-clock-snooze-button | 1× | 1 | · | part |
| 5 | Backlight LED | alarm-clock-backlight-led | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the controls is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |