Strike Train
AssemblySecond weight-driven train that counts and sounds the hours: it lifts the gong hammer and works the bellows, paced by an air-brake fly and timed by the count wheel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Strike Train
9 top-level lines as of r41690| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Brass Wheel | cuckoo-clock-wheel | 4× | 4 | · | part |
| 2 | Lantern Pinion | cuckoo-clock-pinion | 3× | 3 | · | part |
| 3 | Arbor | cuckoo-clock-arbor | 4× | 4 | · | part |
| 4 | Count Wheel | cuckoo-clock-count-wheel | 1× | 1 | · | part |
| 5 | Fly / Air Brake | cuckoo-clock-fly | 1× | 1 | · | part |
| 6 | Gong Hammer | cuckoo-clock-hammer | 1× | 1 | · | part |
| 7 | Coiled Gong | cuckoo-clock-gong | 1× | 1 | · | part |
| 8 | Lift / Lock Lever | cuckoo-clock-lever | 2× | 2 | · | part |
| 9 | Coil Spring | coil-spring | 1× | 1 | · | part |