BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Detent Escapement

Assembly

A spring (chronometer) detent escapement: the balance receives a single impulse per cycle and runs detached the rest of the time, giving the high stability prized for navigation. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Detent Escapement parts and their functions

3 top-level parts · 3 parts in total · full bill of materials below
Detent Escapement parts diagram: 1 escape wheel, 2 spring detent, 3 passing spring. 3 parts in 3 top-level items.
Detent Escapement parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Escape Wheel 1× Escape wheel
2 Spring Detent 1× Spring detent
3 Passing Spring 1× Passing spring

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Detent Escapement

3 top-level lines · 3 rows shown · 3 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Escape Wheel marine-chronometer-escape-wheel 1× 1 · part
2 Spring Detent marine-chronometer-detent 1× 1 · part
3 Passing Spring marine-chronometer-passing-spring 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the detent escapement is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳JLCPCB
jlcpcb.com ↗
Shenzhen, CN PCB fabrication 100 pcs 2–4 wks
🇨🇳PCBWay
pcbway.com ↗
Shenzhen, CN PCB fab & assembly 100 pcs 2–4 wks
scc.com.cn ↗ Shenzhen, CN PCB manufacturer 100 pcs 2–4 wks
shogini.com ↗ Mumbai, IN PCB manufacturer 100 pcs 2–4 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 100 pcs 2–4 wks