Escapement & Gearing
AssemblyThe metering core: a short gear train steps the mainspring up to an escape wheel that a double pallet releases once per pendulum half-swing, producing the click. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Escapement & Gearing parts and their functions
4 top-level parts · 4 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Escape Wheel | 1× | Escape wheel |
| 2 | Pallet | 1× | Double pallet |
| 3 | Movement Plates | 1× | Stamped frame plates |
| 4 | Helical Gear Pair | 1× | Step-up gearing |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Escapement & Gearing
4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Escape Wheel | metronome-escape-wheel | 1× | 1 | · | part |
| 2 | Pallet | metronome-pallet | 1× | 1 | · | part |
| 3 | Movement Plates | metronome-movement-plates | 1× | 1 | · | part |
| 4 | Helical Gear Pair | gear-pair | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the escapement & gearing is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳JLCPCB
jlcpcb.com ↗
|
Shenzhen, CN | PCB fabrication | 100 pcs | 2–4 wks |
|
🇨🇳PCBWay
pcbway.com ↗
|
Shenzhen, CN | PCB fab & assembly | 100 pcs | 2–4 wks |
| scc.com.cn ↗ | Shenzhen, CN | PCB manufacturer | 100 pcs | 2–4 wks |
| shogini.com ↗ | Mumbai, IN | PCB manufacturer | 100 pcs | 2–4 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 100 pcs | 2–4 wks |