Tooling Fixture Assembly
Sourcing — likely vendors
Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates| Vendor | HQ | Specialty | Est. unit price | MOQ | Lead time |
|---|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | $39 | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | $24 | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | $29 | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | $25 | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | $24 | 1,000 pcs | 6–10 wks |
Pneumatic clamping jig locating the workpiece. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
5 top-level lines · 8 rows shown · 25 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Fixture Base Plate | welding-robot-cell-base-plate | 1× | 1 | — | part |
| 2 | Pneumatic Toggle Clamp 3 parts | welding-robot-cell-pneumatic-clamp | 6× | 6 | 3 | assembly |
| 2.1 | Air Cylinder | welding-robot-cell-air-cylinder | 1× | 6 | — | part |
| 2.2 | Clamp Arm | welding-robot-cell-clamp-arm | 1× | 6 | — | part |
| 2.3 | O-Ring Set | oring-set | 1× | 6 | — | part |
| 3 | Locating Pin | welding-robot-cell-locating-pin | 4× | 4 | — | part |
| 4 | Solenoid Valve | welding-robot-cell-solenoid-valve | 1× | 1 | — | part |
| 5 | Fastener Set | fastener-set | 1× | 1 | — | part |